A model for estimating network infrastructure costs : a case for all-fibre LAN networks

dc.contributor.advisorAteya, Ismail Lukandu
dc.creatorMaina, Anthony Mbuki
dc.date05/22/2013
dc.dateWed, 22 May 2013
dc.dateWed, 22 May 2013 18:41:39
dc.dateWed, 22 May 2013 18:55:51
dc.date.accessioned2015-03-18T11:28:58Z
dc.date.available2015-03-18T11:28:58Z
dc.descriptionThesis submitted in partial fulfillment for award of the degree of Master of Information Technology at Strathmore University.
dc.descriptionThe 21st century is an era that has been characterised by phenomenal growth in data rates at the local area network (intranet), extranet and the Internet.This trend has been pushed by the widespread deployment in organisations of “bandwidth-hungry” applications such as VoIP, security surveillance systems, video conferencing and streaming of multimedia content. Due to demand placed on network resources by these applications and services,physical layer cabling solutions have had to evolve to support faster, improved LAN technologies such as Gigabit Ethernet.Although new network architectures (such as Centralised Fibre networks) address current and long term demands of the modern networking environment, concerns have been raised about its cost viability. The key problem identified in this study was an inadequacy of suitable tools that aid decision making when estimating the cost of a network infrastructure project. Factors of importance in this regard were collected in a survey and used in development of a cost model. The model is aimed at being a tool to assist network planners in estimating LAN infrastructure costs. A network was designed based on two architectures – centralised fibre (allfibrenetwork) and hierarchical star (UTP for horizontal cabling and optical fibre for backbone cabling). Thereafter, cost of implementing these two architectures was calculated using the model. Based on the results computed from the cost model, the all-fibre network (centralised fibre architecture) was found to be more cost effective compared to the hierarchical star network.
dc.description.abstractThe 21st century is an era that has been characterised by phenomenal growth in data rates at the local area network (intranet), extranet and the Internet.This trend has been pushed by the widespread deployment in organisations of “bandwidth-hungry” applications such as VoIP, security surveillance systems, video conferencing and streaming of multimedia content. Due to demand placed on network resources by these applications and services,physical layer cabling solutions have had to evolve to support faster, improved LAN technologies such as Gigabit Ethernet.Although new network architectures (such as Centralised Fibre networks) address current and long term demands of the modern networking environment, concerns have been raised about its cost viability. The key problem identified in this study was an inadequacy of suitable tools that aid decision making when estimating the cost of a network infrastructure project. Factors of importance in this regard were collected in a survey and used in development of a cost model. The model is aimed at being a tool to assist network planners in estimating LAN infrastructure costs. A network was designed based on two architectures – centralised fibre (allfibrenetwork) and hierarchical star (UTP for horizontal cabling and optical fibre for backbone cabling). Thereafter, cost of implementing these two architectures was calculated using the model. Based on the results computed from the cost model, the all-fibre network (centralised fibre architecture) was found to be more cost effective compared to the hierarchical star network
dc.formatNumber of Pages:xi, 56 p.
dc.identifierTK5105.7.M35 2012
dc.identifier.urihttp://hdl.handle.net/11071/3561
dc.rightsBy agreeing with and accepting this license, I (the author(s), copyright owner or nominated agent) agree to the conditions, as stated below, for deposit of the item (referred to as .the Work.) in the digital repository maintained by Strathmore University, or any other repository authorized for use by Strathmore University. Non-exclusive Rights Rights granted to the digital repository through this agreement are entirely non-exclusive. I understand that depositing the Work in the repository does not affect my rights to publish the Work elsewhere, either in present or future versions. I agree that Strathmore University may electronically store, copy or translate the Work to any approved medium or format for the purpose of future preservation and accessibility. Strathmore University is not under any obligation to reproduce or display the Work in the same formats or resolutions in which it was originally deposited. SU Digital Repository I understand that work deposited in the digital repository will be accessible to a wide variety of people and institutions, including automated agents and search engines via the World Wide Web. I understand that once the Work is deposited, metadata may be incorporated into public access catalogues. I agree as follows: 1.That I am the author or have the authority of the author/s to make this agreement and do hereby give Strathmore University the right to make the Work available in the way described above. 2.That I have exercised reasonable care to ensure that the Work is original, and to the best of my knowledge, does not breach any laws including those relating to defamation, libel and copyright. 3.That I have, in instances where the intellectual property of other authors or copyright holders is included in the Work, gained explicit permission for the inclusion of that material in the Work, and in the electronic form of the Work as accessed through the open access digital repository, or that I have identified that material for which adequate permission has not been obtained and which will be inaccessible via the digital repository. 4.That Strathmore University does not hold any obligation to take legal action on behalf of the Depositor, or other rights holders, in the event of a breach of intellectual property rights, or any other right, in the material deposited. 5.That if, as a result of my having knowingly or recklessly given a false statement at points 1, 2 or 3 above, the University suffers loss, I will make good that loss and indemnify Strathmore University for all action, suits, proceedings, claims, demands and costs occasioned by the University in consequence of my false statement.
dc.subjectLAN--Reliability
dc.subjectLAN--Mathematical models
dc.titleA model for estimating network infrastructure costs : a case for all-fibre LAN networks
dc.typeThesis
Files